What is the purpose of staffing level estimation in software project management?
- Correct Answer: Software Engineering
- To identify potential risks in the project
- To determine the number of hardware components required
- To allocate appropriate resources to the project
Explanation: To estimate the maintenance costs of the software
More Random Questions
Q: Which river originates in Nepal?
Ans: Gandak
Ans: Gandak
Q: Pure carbon can exist in different forms, depending on how its atoms are arranged. the forms include diamond, graphite, and what else?
Ans: ligands
Ans: ligands
Q: What is the amount after 2 years for Rs. 2
Ans: 000 at 5% compound interest?
Ans: 000 at 5% compound interest?
Q: Claudia Sheinbaum became the first woman president of which country on June 4, 2024?
Ans: Mexico
Ans: Mexico
Q: In Rasa Ratna Samuchchaya, which Bhasma is prepared using Loha?
Ans: Loha Bhasma
Ans: Loha Bhasma
Q: On 2 September 2024, India signed a semiconductor ecosystem agreement with which country?
Ans: Singapore
Ans: Singapore
Q: What does a white circle with a blue number indicate?
Ans: Speed limit
Ans: Speed limit
Q: Who topped the Hurun Philanthropy List 2024?
Ans: Shiv Nadar
Ans: Shiv Nadar
Q: Which body regulates public sector banks in India?
Ans: RBI
Ans: RBI
Q: What are the long carbon chains that make up lipids?
Ans: fatty acids
Ans: fatty acids
Q: Lens faces can generally either be concave, or what, which is the opposite of concave?
Ans: convex
Ans: convex
Q: Who has topped the 'Times Higher Education 2025 Ranking' released on November 26, 2024?
Ans: Oxford University
Ans: Oxford University
Q: What is the resultant waste product of photosynthesis?
Ans: oxygen
Ans: oxygen
Q: What do we call the phase of nuclear division, in which one nucleus divides and becomes two nuclei?
Ans: mitosis
Ans: mitosis
Q: Where did the Indian Air Force successfully test the world's first air-lift portable hospital 'Bhishma' on May 15, 2024?
Ans: Agra
Ans: Agra